Portfolio
135B Tengah — 4-Room BTO Full House Makeover
Project Type: 4-Room BTO Makeover | Budget: $42,000 💰 | Timeline: 6–7 Weeks ⏱️
A sleek 4-room BTO makeover at 135B Tengah featuring architectural ceiling designs, a custom artistic paint accent wall, and eco-friendly E0 solid plywood carpentry with seamless solid-core laminates. Handled on schedule by our in-house direct contractor team.
🔨 Scope of Works
Full House & Feature Walls
- Design ceiling installation & seamless plaster finishing
- Full house painting with primer/sealer for durable adhesion
- Custom design paint feature wall for a unique accent look
- Floor protection laying & post-renovation chemical wash
Plumbing & Sanitary Works
- Complete plumbing works for kitchen & 2 bathrooms
- Inlet/outlet water pipe installation & modification
- Kitchen sink, tap fittings & drainage connection
- Bathroom sanitary ware, basin & accessories installation
🪵 Custom Carpentry
E0 Solid Plywood & Laminates
- Solid core laminate finishes — smooth edges with no black lines
- Custom kitchen cabinets + dry pantry cabinetry & storage
- Living room TV console with concealed wire management
- Master bedroom set: Platform bed + dressing table + wardrobe
🏆 Why Choose Nouvelle Workz
- One contractor. One team. Direct accountability from A to Z
- Direct Contractor Pricing: $42,000 fixed BTO quote (no ID markups)
- Healthier Living: E0 low-formaldehyde plywood (safe for families)
- Prompt 6–7 Weeks Handover: Aligned with your key collection timeline
“Getting keys to your BTO flat soon? Plan your renovation with our direct contractor team.”
📩 Free Consultation & Quotation














