Factory & Industrial Renovation

BCA & bizSAFE Level 3 Certified Direct Builder

Factory, Warehouse & Industrial Renovation Contractor In Singapore

Setting up or upgrading a JTC B1 (Light Industrial) or B2 (General & Heavy Industrial) facility requires strict regulatory compliance, precision space engineering, and heavy-duty structural execution. As a direct renovation builder in Singapore, Nouvelle Workz manages the entire lifecycle — from PE (Professional Engineer) structural endorsement and SCDF / FSSD fire safety clearance to in-house LEW 3-phase electrical installation and heavy-duty industrial epoxy flooring & chemical epoxy grouting.

🏗️

BCA CR06 Registered

Licensed direct contractor with full statutory accountability.

🛡️

bizSAFE Level 3

Strict Risk Assessment (RA) compliant with MOM & JTC site rules.

⚡

LEW & PE Endorsed

Single Line Diagrams, 3-phase power turn-ons & mezzanine permits.

🧪

Epoxy & Grout Specialists

Forklift-grade self-leveling floors & 0% porosity epoxy grouting.

Comprehensive Scope

Complete Industrial Fit-Out & Turnkey Engineering

We eliminate subcontractor delays by managing civil, structural, mechanical, electrical, and specialist flooring in-house.

Civil & Architectural B1 And B2 Industrial Partitioning And Space Planning Singapore

1. B1 & B2 Space Planning & Partitioning

Optimizing industrial floor layouts for maximum operational workflow, acoustic control, and statutory fire compartmentalization.

  • 1-Hour & 2-Hour Fire-Rated Drywall: Gyproc partitions certified for SCDF compartmentalization.
  • Cleanrooms & Sound-Insulated Testing Rooms: Rockwool insulated walls for high-noise machinery.
  • Industrial Sliding Gates & Roller Shutters: Heavy motorized shutters compliant with loading bay specs.
  • Office-Warehouse Partitioning: Modern glass demising walls separating production from management offices.
Specialist Flooring Heavy-Duty Industrial Epoxy Flooring And Epoxy Grout Application Singapore

2. Heavy-Duty Epoxy / PU Flooring & Industrial Epoxy Grout

Engineered for high-impact point loading, constant forklift traffic, aggressive chemicals, and strict SFA food hygiene standards.

  • Heavy-Duty Epoxy Self-Leveling (2-3mm): High compressive strength (>70 MPa) resistant to 3-5 ton forklifts.
  • Polyurethane (PU) Heavy Screed (4-6mm): Thermal-shock resistant (-40°C to +120°C) for cold storage & food factories.
  • Industrial Anti-Chemical Epoxy Grouting: 100% solid non-porous grout for wet areas, drainage channels, and tile joints.
  • Anti-Static (ESD) Flooring: Controlled conductive coatings for electronics manufacturing and cleanrooms.
Mechanical & Electrical 3-Phase Industrial Electrical Wiring And LEW Submissions Singapore

3. 3-Phase Industrial Power & LEW Certification

Complete heavy power distribution systems engineered to sustain CNC machines, industrial compressors, and high-load servers.

  • 3-Phase Power Upgrades (60A To 400A+): Direct coordination with SP Services and building substation.
  • Machinery Power Drops & Isolators: 16A, 32A, 63A weatherproof rotary switches and cable ladder trunking.
  • High-Bay Industrial LED Lighting: Energy-efficient illumination tailored to MOM lux level workplace standards.
  • LEW Testing & Single Line Diagrams (SLD): Official Licensed Electrical Worker endorsement and periodic inspection.
Structural & Fire Safety Structural Steel Mezzanine Platform And SCDF Fire Protection Submissions Singapore

4. Structural Mezzanines & SCDF Fire Protection

Doubling usable warehouse floor area with PE-certified steel platforms while maintaining total fire code compliance.

  • PE-Certified Steel Mezzanines: Custom structural I-beam fabrication with certified floor loading calculations.
  • SCDF / FSSD Fire Safety Approvals: Sprinkler pipe relocation, extended sprinkler heads, and smoke curtains.
  • Fire Alarm & Break-Glass Integration: Connecting industrial units to main landlord fire alarm monitoring systems.
  • Emergency Exit & Signage Compliance: SCDF-compliant illuminated exit signs, emergency lights, and fire hose reels.
Floor Engineering Spotlight

Why Flooring & Epoxy Grout Determine Industrial Longevity

In B1/B2 industrial spaces, standard cement screed and conventional tile grout quickly degrade under wheel traffic and chemical spills. Nouvelle Workz provides dedicated industrial resin and chemical-resistant grouting systems designed specifically for high-stress Singapore facilities.

⚠️ The Risk Of Standard Screed

Concrete Dusting: Unsealed concrete continuously sheds microscopic cement powder, damaging electronics, motors, and packaging.

Porous Tile Grout: Traditional cement grout absorbs water, oils, and chemicals. Over time, it turns black, harbors bacteria, and crumbles under pressure washers.

Point-Load Cracking: Heavy pallet jacks and solid polyurethane forklift wheels crush porous cement screeds, creating hazardous potholes.

🛡️ Heavy-Duty Epoxy / PU Coatings

Seamless Protection: 2mm - 3mm high-build self-leveling epoxy creates an impervious, dust-proof surface with high chemical resistance.

Compressive Strength: Formulated to exceed 70 MPa compressive capacity — easily handling continuous forklift traffic without chipping.

Anti-Slip Profiling: Textured aggregate finishes (R10 to R12 rating) ensure worker safety around wet or oily production lines.

Read Our Commercial Epoxy Coating Guide >

🧪 Industrial Anti-Chemical Epoxy Grout

0% Porosity Jointing: Made of two-part epoxy resin and hardener, cures into a solid impenetrable joint with zero moisture absorption.

Acid & Chemical Proof: Resists harsh cleaning acids, degreasers, hydraulic oils, and high-pressure steam cleaning.

SFA & Hygiene Compliance: 100% mold-proof and antibacterial — the mandatory standard for food manufacturing, commercial kitchens, and cleanrooms.

Explore Our Specialist Epoxy Grout Service >

Industrial Flooring Performance Comparison

Performance MetricRaw Concrete ScreedStandard Tiles + Cement GroutHeavy-Duty Industrial Epoxy (2-3mm)Industrial Anti-Chemical Epoxy Grout
Forklift & Wheel LoadModerate (Surface wear)Poor (Tiles crack)Excellent (>70 MPa capacity)Very High (Flexible joint)
Chemical & Oil ResistanceFails (Absorbs deep stains)Moderate (Grout erodes)High (Impervious barrier)Superior (Resists harsh acids)
Dust PreventionFails (Constant dust)Moderate100% Dust-Proof100% Dust-Proof
Moisture Absorption & MouldHigh absorptionPorous grout harbors moldZero absorption0% Porosity (Mold-free)
SFA Food & Cleanroom ReadyNon-compliantNon-compliant (Porous joints)Fully Compliant (Seamless)Fully Compliant (Antibacterial)
Typical Industrial Lifespan1 - 2 Years before pitting2 - 3 Years before grout cracks7 - 10+ Years with re-coat10+ Years permanent bond
Seamless Execution

Our 4-Step Turnkey Industrial Delivery Process

From initial JTC spatial assessment to SCDF Fire Safety Certificate sign-off, we keep your business operational with minimal downtime.

01

On-Site Survey & Feasibility

Comprehensive physical inspection of unit floor loading capacity (kN/m²), ceiling heights, 3-phase incoming power, and JTC/MCST renovation deposit guidelines.

02

2D/3D Layout & Statutory Approvals

Precision operational space planning, Professional Engineer (PE) structural calculations for mezzanines, and official SCDF/FSSD fire sprinkler submission filings.

03

Civil, 3-Phase M&E & Epoxy Fit-Out

Direct in-house execution: structural steel fabrication, subfloor diamond grinding, heavy-duty forklift epoxy/PU flooring, and Licensed Electrical Worker (LEW) 3-phase wiring.

04

Statutory Testing & SCDF Handover

LEW electrical turn-on, Registered Inspector (RI) fire inspection, joint client defect audit, and formal unit handover backed by direct builder warranties.

Direct Transparency

2026 Factory & Industrial Renovation Cost Benchmarks

Realistic budget ranges for Singapore industrial units. Every project receives an itemized quotation with zero hidden markups.

Renovation Package / ScopeTypical Scope IncludedEstimated 2026 Price RangeTypical Timeline
B1 Light Industrial Fit-Out (1,500 - 3,000 sqft)Office drywall partitions, basic power points, LED high-bay lights, vinyl flooring in office, paintworks$18,000 – $38,0003 – 5 Weeks
B2 Heavy Industrial / Workshop (3,000 - 6,000 sqft)Fire-rated walls, 3-phase heavy wiring, isolators, exhaust trunking, heavy-duty floor coating$45,000 – $95,0006 – 8 Weeks
Industrial Heavy-Duty Epoxy Flooring (2mm - 3mm)Subfloor diamond grinding, moisture test, primer, high-build self-leveling epoxy (forklift-grade)$4.50 – $7.50 / sqft3 – 5 Days
Heavy-Duty Polyurethane (PU) Screed (4mm - 6mm)Thermal shock (-40°C to 120°C), steam-cleanable, food/chemical grade seamless coating$8.50 – $14.00 / sqft4 – 6 Days
Industrial Anti-Chemical Epoxy GroutingDeep joint cleaning, 100% solid epoxy injection, zero porosity, chemical & bacteria proof$4.00 – $6.50 / sqft2 – 4 Days
Structural Steel Mezzanine Platform (PE Endorsed)Engineered I-beams, steel decking, safety railings, industrial staircase, load calculation sign-off$85 – $130 / sqft4 – 6 Weeks
SCDF Fire Safety & Sprinkler SubmissionsSprinkler head extension/relocation, fire alarm link, PE/RI submission, FSC permit processing$3,500 – $6,500 / project3 – 4 Weeks
3-Phase LEW Electrical Endorsement & SLDSingle Line Diagram preparation, load test, SP Services turn-on, LEW formal endorsement$1,800 – $3,500 / submission1 – 2 Weeks

* Disclaimer & Pricing Notice: The rates and timeline benchmarks provided above serve as general Singapore market reference estimates only and do not represent a final binding quotation. Exact industrial renovation and specialist flooring costs depend strictly on your unit's floor area, ceiling height, concrete subfloor condition, floor loading limits (kN/m²), 3-phase power requirements, and specific JTC, BCA, or SCDF statutory compliance clauses. Contact our direct engineering team for a complimentary on-site survey and transparent, itemized quotation.

Smart Procurement

Direct Builder Vs Traditional Interior Design Agency

Why Singapore business owners and logistics operators save thousands by commissioning a direct contractor.

✅ Commissioning Nouvelle Workz (Direct Builder)

  • Direct Contractor Pricing: No 15% - 25% design agency commissions or middlemen markups.
  • In-House Technical Specialists: Our own electricians, welders, and epoxy floor technicians on site.
  • Direct Authority Handling: Fast-track coordination with JTC, BCA, SCDF, and building management.
  • Unified Accountability: A dedicated project manager ensuring fixed handover dates and zero finger-pointing.
  • Direct Workmanship Warranties: Fast 48-hour response for any defects or post-handover adjustments.

❌ Using Traditional Design Agencies / Brokers

  • Hefty Subcontractor Markups: Industrial trades (epoxy, 3-phase, steel) subcontracted with 20%+ padding.
  • Communication Bottlenecks: Designers lack industrial M&E and chemical floor prep knowledge.
  • Slow Authority Submissions: Third-party PE and LEW consultants lead to weeks of scheduling friction.
  • Permit & Handover Disputes: Misaligned timelines risk hefty landlord delay penalties and lost revenue.

Featured Case Study: OceanScan Changi Industrial Facility

Discover how Nouvelle Workz engineered a high-performance industrial fit-out in Changi, combining heavy-duty electrical distribution, dedicated structural steel mezzanine, specialized epoxy flooring, and modern executive offices.

Got Questions?

Frequently Asked Questions

Key technical and regulatory answers regarding factory renovations and industrial flooring in Singapore.

1. Do I Need JTC And BCA Approval For Factory Renovation In Singapore?

Yes. If your unit is located within a JTC estate or managed building, you must submit a renovation proposal and receive written clearance before works begin. Submissions typically include architectural layout plans, floor loading assessments, and contractor insurance endorsements. Nouvelle Workz handles the entire submission package on your behalf to avoid administrative rejection.

2. When Is A Structural PE (Professional Engineer) Endorsement Required?

A PE endorsement is legally required whenever you modify or add structural elements — such as constructing a steel mezzanine platform, mounting heavy overhead hoists or cranes, installing heavy racking systems exceeding floor load limits (kN/m²), or hacking structural reinforced concrete walls. Our in-house engineering partners conduct structural calculations and submit formal endorsements directly to BCA.

3. What Is The Difference Between B1 And B2 Industrial Zoning For Renovation Works?

B1 (Light Industrial): Intended for clean, high-tech, software, e-commerce, or light manufacturing operations with minimal noise, nuisance, or pollutant emissions. Fit-outs often balance production floors with premium corporate office spaces.
B2 (General & Heavy Industrial): Accommodates heavy engineering, chemical handling, automotive servicing, and metal fabrication. Fit-outs require specialized safety measures such as explosion-proof wiring, trade effluent neutralization sumps (PUB), high-capacity exhaust ventilation, and heavy-duty forklift-rated flooring.

4. Why Is Heavy-Duty Epoxy Or PU Flooring Essential For Industrial Factories?

Standard bare concrete creates constant cement dust (起砂) that contaminates products and electronics, and absorbs engine oils and chemical spills permanently. Our heavy-duty self-leveling epoxy (2-3mm) and PU screed (4-6mm) provide an impervious, seamless, dust-proof barrier with compressive strength exceeding 70 MPa. It is engineered to withstand continuous 3-5 ton forklift traffic and meets strict SFA hygiene requirements for food factories.

5. What Are The Benefits Of Industrial Epoxy Grout Over Traditional Cement Grout?

Traditional cement grout is highly porous — it absorbs water, oils, and chemical washdowns, leading to cracking, black stains, and bacterial growth. Industrial epoxy grout is a 100% solid, two-part resin system that cures into an impenetrable, non-porous joint. It has zero water absorption, resists harsh industrial acids and cleaning agents, and will not crumble under high-pressure hot water washing. It is essential for commercial food processing facilities, cold rooms, and cleanrooms.

6. How Long Does Industrial Epoxy Flooring Take To Cure Before Forklifts Can Drive On It?

Our heavy-duty industrial epoxy is touch-dry within 12–16 hours. Light foot traffic can resume after 24 hours. Full chemical cure and heavy forklift or pallet jack traffic require 72 hours. We plan application stages carefully or work during weekend shutdowns to minimize operational disruption to your business.

7. Can You Upgrade Our 3-Phase Power Supply And Handle LEW Licensing?

Yes. Many manufacturing and engineering facilities require upgrading from standard power to 60A, 100A, or 200A+ 3-phase power to operate heavy machinery. Our Licensed Electrical Workers (LEW) prepare Single Line Diagrams (SLD), coordinate capacity turn-ons with SP Services, install heavy-duty busducts and distribution boards, and perform all mandatory statutory testing.

8. What SCDF Fire Safety Approvals (FSSD) Are Needed For Factory Fit-Outs?

Whenever you alter internal partitions, add mezzanine floors, or modify ceiling heights, fire sprinkler coverage and smoke detectors must be relocated to comply with SCDF Fire Code. We manage fire safety plans, supply certified 1-hour/2-hour fire-rated drywalls, install fire doors with valid Certificates of Conformity (CoC), and engage Registered Inspectors (RI) for Fire Safety Certificate (FSC) sign-off.

9. How Does Nouvelle Workz Ensure Transparent Pricing With No Hidden Costs?

Unlike interior design middlemen who add 15–25% broker margins and conceal subcontracted costs, Nouvelle Workz is a direct contractor. We provide comprehensive, itemized bills of quantities detailing civil hacking, electrical points, flooring square-footage, and statutory fees. You pay direct builder rates with clear milestone-based invoicing.

10. Do You Provide A Free On-Site Survey And Layout Consultation?

Yes! We provide complimentary on-site surveys across Singapore (Tuas, Jurong, Changi, Pioneer, Sungei Kadut, Ubi, Kaki Bukit, Woodlands, and all JTC industrial parks). Our project team assesses your unit’s floor loading, electrical intake, and building management guidelines to provide an itemized quote within 24 to 48 hours.

Review On Us

mozpreciouz idayu profile picture
mozpreciouz idayu
2 months ago
It's a great pleasure to be working with Nouvelle Workz. They are very acxomodating and patient with us and to our needs. They gave good advices during our reno process. The whole team works very well.
nisha begam profile picture
nisha begam
2 months ago
We had a wonderful experience with our home renovation. From the initial discussion to the final handover, the team (especially James & Vivian) were professional, responsive, and attentive to our needs. They listened to our ideas, provided practical suggestions, and delivered quality workmanship throughout the project. The renovation was completed with great attention to detail, and any issues that came up were resolved promptly. Communication was clear, and the team kept us updated on the progress every step of the way. Our home turned out exactly how we envisioned it, and we couldn't be happier with the result. Thank you for your dedication and hard work. We highly recommend this renovation company to anyone looking for a reliable and trustworthy contractor!
Hadi Sanchez profile picture
Hadi Sanchez
2 months ago
A huge thank you to all the amazing people who worked tirelessly to complete this project on time, making it possible for my parents to settle in. Thanks again ⁨James Liang⁩ and Vivian Siew⁩ you guys are great 👍🏼👍🏼👍🏼
denise hong profile picture
denise hong
3 months ago
Thank you to James, Vivian and the team for the amazing job that they have done to revamp our old kitchen. Entire renovation process was relatively smooth and they were quick to respond to any queries. Costs were reasonable and upfront. The team also paid great attention to details. Highly recommend! 👍👍👍
Siewhui Chong profile picture
Siewhui Chong
3 months ago
Engage them for my bto. Transparent price and need not worry about hidden costs. Good after service too.
Levia Chin profile picture
Levia Chin
3 months ago
Excellent experience renovating my 3 room BTO with James and Vivian. They are smooth, well-organised, and highly proactive through the journey. Very responsive and efficient and never felt pressured to make any decisions I didn’t like. They took time to understand my budget and provided professional feedback and suggestion. Workmanship is up to expectation. Communication was excellent. Thank you for doing up a good job! It gave me alot of peace throughout. Highly recommend!
KHAI LONG CHIN profile picture
KHAI LONG CHIN
4 months ago
Very satisfied with the renovation work completed by the team. From the initial consultation to the final handover, they demonstrated professionalism, responsiveness, and attention to detail. The workmanship was of a high standard, and the team took care to ensure that every aspect of the project was completed properly. They were patient in addressing questions and provided useful suggestions throughout the renovation process. The project was completed within the agreed timeline, and any minor issues were promptly rectified. I especially appreciate their commitment to quality and their efforts to keep the worksite organized and clean. The finished result exceeded my expectations and has transformed my home into a comfortable and beautiful living space. I would highly recommend them to anyone looking for a reliable and professional renovation contractor.
Junior Mohd profile picture
Junior Mohd
4 months ago
From the initial consultation to final handover, James and Vivian guided us with efficiency, honesty, and complete transparency. Right from day one, we were upfront about our budget, and they ensured all recommended works aligned perfectly with it. During the on-site assessment, both James and Vivian were incredibly helpful, suggesting cost-effective designs that wouldn't burn a hole in our pocket. Once the project kicked off, everything from carpentry to flooring and accessories was managed simultaneously. Despite a tight timeline of just three weeks, they exceeded expectations and finished ahead of schedule! Kudos to James, Vivian, and Max for such a seamless and smooth experience!
Cheryl Lim profile picture
Cheryl Lim
4 months ago
Great experience working with James and Vivian for our BTO reno. Appreciated their transparent prices, quick follow ups and guidance for new homeowners like us. They were very easy to communicate and quick to provide solutions as well. Also worked very closely and managed their subcons well 🙂 Will recommend Nouvelle if you’re looking to renovate your house with a main con!
Syed Ibrahim profile picture
Syed Ibrahim
8 months ago
Nouvelle Workz (James & Lynn) We engaged Nouvelle Workz for our kitchen and toilet renovation on very short notice, with less than a month to complete the entire project. Despite the tight timeline, James and Lynn delivered as promised and the works were completed on schedule and handed over on time. Throughout the renovation, they were responsive and attentive, ensuring that all concerns raised were addressed promptly and professionally. Their efficiency and accountability helped make the renovation experience much less stressful. Once again, thank you James and Lynn for your trustworthiness and reliable standard of work. We truly appreciate the effort put in and would not hesitate to recommend Nouvelle Workz! ☺️✌🏽
Adam Alysha profile picture
Adam Alysha
8 months ago
Nouvelle Workz delivered exceptional results on our home renovation, completing the project by the end of January, significantly ahead of the initial March deadline. This swift progress was largely due to the outstanding facilitation by James and Vivian. Key highlights of their service include: -Rapid Completion: The project was finished ahead of schedule, showcasing impressive efficiency. -Proactive communication: Daily updates and a clear timeline kept us informed and involved throughout the process. -Flexibility and Adaptability: The contractors readily accommodated last-minute changes to ensure our vision was fully realised. -Cost-Effectiveness: James and Vivian provided substantial cost savings through no-cost additions or significant discounts, helping us stay within budget. -Peace of mind: The entire renovation was a thrilling experience, and the one-year warranty post-handover further solidified our confidence in their work. Thank you James and Vivian!
Scroll to Top