Quick answer: A 5-room BTO renovation in Singapore starts from $6,999 for our basic BTO package, which covers kitchen cabinets, a countertop, plumbing fittings and whole-house painting. Most owners add more than that. Two recent 5-room BTO owners paid us $14,000 and $23,000, and the difference came down to bathroom tile overlay, a built-in wardrobe and how much custom carpentry each of them chose.
A 5-room flat is the largest standard BTO layout, so many new owners expect the renovation bill to be the largest too. In practice, the size of the flat has less effect on the price than the list of things you ask the contractor to build.
This guide uses real numbers only: our published 5-room BTO package price and the final amounts two 5-room BTO owners in Tengah and Yishun paid us. You will see what each budget covered, which items moved the price, and how to plan your own scope before you ask for quotes.
5-Room BTO Renovation Cost at a Glance (2026)
| Scope | Cost | Duration |
|---|---|---|
| Basic 5-room BTO package | From $6,999 | Depends on scope |
| 134C Tengah Garden: kitchen, living room partition, painting, plumbing | $14,000 | Not listed |
| 936 Yishun Beacon: kitchen, 2-bathroom tile overlay, master wardrobe, painting | $23,000 | 7 weeks |
These are final amounts for completed projects, not quotes. For every flat type side by side, see our BTO renovation packages: they start from $5,999 (2-room), $6,399 (3-room), $6,699 (4-room) and $6,999 (5-room).
Why the 5-Room Starting Price Is Only $300 More Than a 4-Room
The 5-room package starts just $300 above the 4-room package. That surprises many owners, but it makes sense once you look at what a package pays for. According to our BTO page, the package covers:
- Kitchen carpentry: 20 ft of top and bottom kitchen cabinets in E0-grade low-formaldehyde plywood, with Blum soft-close hinges, three full-extension soft-close drawers and a Blum HK overhead bi-fold dish rack.
- Countertop and masonry: a mortar masonry cabinet base with waterproof skirting and 10 ft of engineered quartz or sintered stone countertop with an undermount sink.
- Plumbing and fittings: bathroom accessories and mirrors for both toilets, the kitchen sink and tap connection, water heater wiring and piping, and the washing machine inlet and drainage.
- Whole-house painting: walls and ceilings in up to five colours with Nippon or Dulux paint over an undercoat sealer, plus anti-mould ceiling paint in both bathrooms.
A 5-room flat has the same number of kitchens and bathrooms as a 4-room flat. Only the painting area grows with the floor plan. So at package level, a bigger flat costs only slightly more.
The package also includes a complimentary key-collection defect check, HDB permit processing and a 12-month workmanship warranty. To compare packages from different contractors line by line, read our BTO renovation checklist.
What $14,000 and $23,000 Actually Bought
Here is the scope behind each price, taken from the project pages.
134C Tengah Garden: $14,000

This owner wanted a practical, functional home without a long list of built-ins. The work started with surface protection before renovation and whole-house painting with sealer. The kitchen got cabinets in E0 solid plywood with solid-core laminate and ABS trims, a sintered stone countertop and a tempered glass backsplash. In the living room, the team built a custom partition to define the space. Full plumbing works for the kitchen and both bathrooms completed the job. See the Tengah Garden project.
If you are also collecting keys in Tengah, our Tengah BTO renovation guide covers design ideas and the hacking rules for the estate.
936 Yishun Beacon: $23,000, 7 weeks

This was a more complete makeover. Both bathrooms received wall and floor tile overlay with epoxy grout, which changes the look of a new BTO bathroom without hacking. The kitchen cabinets were built in E0 solid plywood with solid-core laminate, ABS trims, soft-close drawers, Blum hardware and a design tile backing. The master bedroom got a built-in wardrobe, and the whole house was painted with sealer under full-house protection. See the Yishun Beacon project.
The two projects side by side
| Item | 134C Tengah Garden ($14,000) | 936 Yishun Beacon ($23,000) |
|---|---|---|
| Protection and whole-house painting with sealer | Yes | Yes |
| Custom kitchen cabinets in E0 solid plywood | Yes | Yes, with Blum hardware |
| Kitchen wall finish | Tempered glass backsplash | Design tile backing |
| Living room partition | Yes | No |
| Bathroom tile overlay with epoxy grout | No | Yes, 2 bathrooms |
| Master bedroom built-in wardrobe | No | Yes |
The $9,000 gap between the two flats is explained by two additions: tile overlay in both bathrooms and a built-in wardrobe. Neither project fitted wardrobes in every bedroom or a design ceiling, which is why both stayed well below $30,000.
Where a 5-Room BTO Budget Grows
- Bedroom carpentry. A 5-room flat has three bedrooms, and each built-in wardrobe adds to the bill. The Yishun owner built one, in the master bedroom. Building all three is one of the fastest ways to raise the total.
- Bathroom overlay. HDB does not allow hacking of the floor and wall tiles in a new BTO bathroom for the first three years, to protect the waterproofing membrane. Tile overlay is the approved way to change the look, and it is an extra on top of the package. Our BTO and HDB bathroom renovation guide explains how overlay works.
- The larger living and dining area. More open space invites more built-ins: partitions, TV consoles, shoe cabinets and feature walls. The Tengah Garden owner added a single partition and stopped there.
- Ceiling works. For comparison, a full-house 4-room project of ours at 135B Tengah, with a design ceiling, a dry pantry and a master bedroom set with a platform bed, came to $42,000. A 5-room flat with the same wish list should expect to land in similar territory or above.
How to Plan a 5-Room BTO Budget in Four Steps
- Do the defect check first. A new flat has a one-year Defects Liability Period. Log defects with HDB before any work begins, so they are fixed at no cost to you and not covered up by new carpentry.
- Price the essentials. Start from the package: kitchen, countertop, plumbing fittings and painting. This is what you need to move in.
- Add built-ins one at a time. Ask for each wardrobe, cabinet and partition as a separate line. You can then see exactly what every item costs and remove the ones you can live without.
- Decide on the bathrooms early. Tile overlay is easier to schedule alongside the other wet works than as a separate job after you have moved in.
Working with a direct contractor helps at every step. Nouvelle Workz builds carpentry in its own factory with an in-house team, and on our BTO page we estimate the saving from cutting out interior design fees at 20% to 30%.
Just collected the keys to your 5-room BTO? WhatsApp us today with your floor plan for an itemised, direct-contractor quote from the Nouvelle Workz team.
Frequently Asked Questions
How much does it cost to renovate a 5-room BTO flat?
At Nouvelle Workz, the 5-room BTO package starts from $6,999. With extra carpentry and bathroom works the cost is higher: two recent 5-room BTO projects came to $14,000 and $23,000, depending mainly on bathroom tile overlay, wardrobes and other built-ins.
Is a 5-room BTO much more expensive to renovate than a 4-room?
Not at package level. Our 5-room BTO package starts from $6,999 and the 4-room package from $6,699, a difference of $300, because both flat types have one kitchen and two bathrooms. The final cost depends more on how much carpentry you add than on the size of the flat.
How long does a 5-room BTO renovation take?
Our 5-room BTO makeover at 936 Yishun Beacon, with kitchen carpentry, tile overlay in two bathrooms, a master bedroom wardrobe and whole-house painting, was completed in 7 weeks. A package-level BTO job with less carpentry is faster: our 4-room bundle at 781B Woodlands was ready in 2 weeks.
Can I change the bathroom tiles in a new 5-room BTO?
You cannot hack them. HDB does not allow hacking of the floor and wall tiles in a new BTO bathroom for the first three years, to protect the waterproofing membrane. Tile overlay is the alternative, and it is what we did for both bathrooms at 936 Yishun Beacon.